2.2 Systems Life Cycle
What You Need to Know
Section titled “What You Need to Know”A systems life cycle is the sequence of phases a system goes through, from first idea to switch-off. Each of its canonical phases owns a set of activities.
- Planning and requirements
- Design
- Development
- Testing
- Implementation and deployment
- Operations and maintenance
- Retirement
A lighting shop has piloted a Claude assistant that drafts replies to customer questions about bulbs. Staff check every draft in a manual review queue. Now the assistant is moving to production.
The Phases and What They Own
Section titled “The Phases and What They Own”- Designing the regression eval set is testing, even when the shop does it weeks before any deployment. Evals are derived from requirements, not reverse-engineered from incidents. A suite built from incidents pins yesterday’s failures instead of the required behaviour.
- The cutover plan that swaps the pilot’s manual review queue for the production approval flow is implementation. It happens once.
- The standing cost-per-task dashboard, error triage, prompt fixes and the plan for moving off a deprecated model are operations and maintenance. They recur for the life of the system.
- Switching off the pilot stack and disposing of its logs is retirement. Data disposition is part of that phase. Turning the servers off is not the whole phase.
The usual mistake treats go-live as the finish line, where the project is done. For a Claude application the maintenance load is structural, not residual. A prompt change is a behaviour change, and it can ship in hours. The model underneath also moves on a clock the shop does not control.
Cadence Changes, Concerns Do Not
Section titled “Cadence Changes, Concerns Do Not”Agile, iterative and plan-driven frameworks all contain the same concerns: requirements, design, build, test, deploy, operate, retire. They differ in how often the loop turns. Claude applications push cadence to the fast extreme: the shop changes a prompt, runs evals and releases in short loops. Each turn changes behaviour, so the eval suite is the recurring test phase rather than a one-time gate.
The Deprecation Clock
Section titled “The Deprecation Clock”Anthropic’s documented model lifecycle runs Active, Legacy, Deprecated, Retired. A deprecated model still works but is no longer recommended. Anthropic gives it a recommended replacement and a retirement date. A retired model fails every request. Publicly released models get at least 60 days’ notice before retirement, on the deprecations page and by email. Once a model is deprecated, all usage must be migrated to a suitable replacement before its retirement date.
The shop does not set that date, and after it every draft request to the old model fails. So the shop plans for the migration from day one, as an external event.
- Re-run the eval suite against the replacement, to check it still meets the shop’s requirements.
- Roll the replacement out through the normal release process.
- Audit which keys still call the old model, because any key left on it fails at retirement.
These dates bind Anthropic-operated platforms. Amazon Bedrock and Google Cloud set their own retirement schedules. A shop serving its assistant from two surfaces could face two migration deadlines for one model.
Confirming what an identifier currently resolves to is one API call.
import anthropic
client = anthropic.Anthropic()
model = client.models.retrieve("claude-sonnet-5-5")print(model.id, model.display_name, model.created_at)
# What can this key still reach?for m in client.models.list(limit=20): print(m.id)A shop that learns of a retirement from failing requests skipped the maintenance phase.
In the exam
Section titled “In the exam”This is the domain’s lightest sub-skill and its most mappable. Items do not ask you to recite phases; they hand you an activity and ask which phase governs it. Learn the ownership table and most of the sub-skill follows. If an item asks which framework adds or removes a life cycle concern, the answer is none. Platform matters whenever a stem mentions it.
The deprecations page carries the lifecycle states and dates; the Models API shows what your keys can reach today.
Exam Traps
Section titled “Exam Traps”Practice Scenario
Section titled “Practice Scenario”A launderette chain’s Claude-based machine-fault report classifier is moving from a six-month pilot to production service. The team lists four activities: (1) a standing dashboard tracking cost per classified report plus a written plan for migrating when the pinned model is eventually deprecated; (2) the regression eval set that will gate every release; (3) the cutover plan replacing the pilot’s manual review queue with the production approval flow; (4) decommissioning the pilot stack and disposing of its logs. Which activity belongs to the operations and maintenance phase?
- A. Activity (1): the standing cost dashboard and the model-migration plan, which recur for the life of the system
- B. Activity (2): the regression eval set, because once the service is live it will be re-run continuously against every release the team ships
- C. Activity (3): the cutover plan, because it governs how the production service starts operating on its first live day
- D. Activity (4): decommissioning the pilot stack, because cleaning up superseded systems is routine operational housekeeping for any live production service
Answer & explanation
Correct: A
- A — Standing monitoring and deprecation-driven migration planning are the operations-and-maintenance workload, and both recur. The other activities belong to testing, implementation and retirement respectively.
- B — Re-running evals happens in operations, but designing the suite that gates releases is the deliverable of the testing phase. The stem describes its creation, not its recurring execution.
- C — Cutover is the implementation phase. It happens once, and mentioning operation in its outcome does not move it into the operations phase.
- D — Decommissioning a system and disposing of its data is the retirement phase, not operations housekeeping. The pilot is ending its life cycle.
Sources
Section titled “Sources”- Model deprecations — Claude Docs, the Active/Legacy/Deprecated/Retired lifecycle and the 60-day notice commitment
- Models overview — Claude Docs, current model identifiers and what each resolves to
- Claude Certified Developer Foundations Exam Guide — Domain 2, Systems Life Cycle — Anthropic